User contributions
- 09:50, 19 December 2013 (diff | hist) Open book accounting
- 09:41, 19 December 2013 (diff | hist) Management contractor
- 09:41, 19 December 2013 (diff | hist) Framework contract
- 09:40, 19 December 2013 (diff | hist) Cost reimbursable contract
- 09:39, 19 December 2013 (diff | hist) Target cost for construction
- 09:38, 19 December 2013 (diff | hist) N Lump-sum contract (Redirected page to Lump sum contract) (top)
- 09:38, 19 December 2013 (diff | hist) Fixed price construction contract
- 09:37, 19 December 2013 (diff | hist) N Fixed-price contract (Redirected page to Fixed price contract)
- 09:37, 19 December 2013 (diff | hist) N Target-cost contract (Redirected page to Target cost contract)
- 09:35, 19 December 2013 (diff | hist) N Open book accounting (Created page with " = Introduction = Open-book accounting is a method of procuring work under which contractors are reimbursed on the basis of transparent records of the costs they have incurred....")
- 08:55, 20 September 2013 (diff | hist) N Specialist contractors start up meeting (Redirected page to Specialist contractors' start-up meeting)
- 08:54, 20 September 2013 (diff | hist) Specialist designer for construction projects
- 08:54, 20 September 2013 (diff | hist) Lead designer
- 08:53, 20 September 2013 (diff | hist) Contractor's design portion
- 08:53, 20 September 2013 (diff | hist) Design management plan
- 08:53, 20 September 2013 (diff | hist) N Contractors designed portion (Redirected page to Contractor's design portion) (top)
- 08:52, 20 September 2013 (diff | hist) Design manager
- 08:43, 20 September 2013 (diff | hist) N Design manager (Created page with " Design managers initially emerged from contractors undertaking a portion of design involving their specialist subcontractors. Traditionally the contractor was presented with a...")
- 09:09, 16 September 2013 (diff | hist) Valuation of interim payments
- 09:06, 16 September 2013 (diff | hist) Set off in construction contracts
- 09:05, 16 September 2013 (diff | hist) Valuation of interim payments
- 10:26, 9 September 2013 (diff | hist) User:David Trench (top)
Featured articles and news
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.